Finishing engineering this year, production starts next year. Aiming to have release candidate design drivable late summer. Tri-motor drive system & advanced battery work were important precursors. — Elon Musk (@elonmusk) January 28, 2021
Finishing engineering this year, production starts next year. Aiming to have release candidate design drivable late summer. Tri-motor drive system & advanced battery work were important precursors. — Elon Musk (@elonmusk) January 28, 2021
Falcon 9 launches 143 spacecraft to orbit — the most ever deployed on a single mission — completing SpaceX’s first dedicated SmallSat Rideshare Program mission pic.twitter.com/CJSUvKWeb4 — SpaceX (@SpaceX) January 25, 2021
Under Vegas in @boringcompany tunnel yesterday with my boys pic.twitter.com/tLfOuiEdFm — Elon Musk (@elonmusk) January 24, 2021
Fallout-themed opening party for Vegas Loop happening as soon as allowed! — Elon Musk (@elonmusk) January 24, 2021
Scoop.There are 4 Tesla semis being built at GFNV. They will use the new higher density 2170 L cells from GFNV, not the 4680s. There will be three packs in a row, each half as long as a Model S. There will be 2 for road testing, 1 for durability testing, and 1 for Alaska……
All Tesla cars delivered in the final three days of the year will get three months of the Full Self-Driving option for free. Delivery & docs must be fully complete by midnight Dec 31st. — Elon Musk (@elonmusk) December 29, 2020