I got a chance to read through your threads, painful. Have you made any process filing a complaint with CPUC . or just give up?
Gas pipe to electrical conduit (floor) reads 36.5", the main panel breaches the 36". I'll need to have the load panel installed to the left of the meter, or hope a like-for-like is authorized.