Separate names with a comma.
After 11 months of Tesla fun and games plus the creation of the new Vaughan store, they finally ordered and replaced my half shafts. My death...
Confirmed by support - SB noted above does not apply to Raven - I guess we keep driving until front forelinks fail and someone gets killed .. crazy
yes. it gets worse over time
What is the plan forwards - wait until the fix comes out, - wait for complete failure - wait until the failure causes harm - recall ?
Aug 2019 if I can recall
My 2019 S Raven is vibrating from front drive - Tesla keeps telling me its with Engineering. Was wondering how long it normally takes to find a...
Checked - Tesla does not ship cars with 14-50 and longer.. what a pain, my last S had it in the kit
funny timing = just received 2019.12.1.1 2016 AP1 75D - blank release notes
Spoke with Tesla 10 mins back 2018.50.6 is the latest version for AP1 - was driving me insane as they where telling me a download was waiting -...
new supercharger will be just north of new service centre 48,500 sqft of Floor Area for Tesla at Google Maps
New Tesla delivery centre ... 5500 Dundas st West . Toronto. Permit issued
awesome - Vaughan will become the Tesla capital of the north :)
Excellent news, no more fighting the DVP to get to the Service Centre. Wonder if this will be the Vaughan supercharges as noted on the map.
can someone in the area count the number of wooden blocked of areas, that normally equals stalls
Karmas trying hard to be a Tesla - not a great purchase
of note "Tesla is committed to ensuring that Supercharger will never be a profit center." Supercharging
All SC up and running - Pavement work complete on west side
Not expecting much change in SC activity until profitability - need to get cash positive or the shorts and buddies will just continue the FUD
Half the Sc's are not accessible, pavement operations. The remaining 10 work great . [ATTACH]
Says reduced service - will check tomorrow - they where relaying the pavement in the parking last time
2 cars charging, mine was at 40Kw but 60% full - map indicator showed 6 charging - 0.8 m from work
Lights are up on the East side - hopefully the city transformer will arrive soon
City is working on getting cables to the SC - no city Transformer yet
Not much change - no transformer - lots of small cosmetic work - e.g. new black asphalt paving around SC cabinets - no lines yet. We know that...
Next one hopefully is close to Niagara Falls.. quire a cluster in this area - like Markham Vaughan - 3*20 in 12 km
Serious Switch or Super Switch unit
Concrete base for city transformer poured. Curbs and asphalt, fixed. Most of the dirt has been replaced. Enclosure (Fence) build for SC's ( no...
Quick update - signposts going up, cosmetic work in progress and city transformer pad needs some concrete - looks like all other wiring in place -...
U will love it if you can get power say 30 amps 220v to the car overnight - charge at 2c /Kwh. while u sleep
I trust that #tesla did the math.. clearly there is need for two in Markham- 404 is very close to the new site
because they can.. the more the better for all of us, including the ICE drivers who can now see the folly of their way :)
I got the idea today from discussions in Toronto service ctr, that there maybe a new service ctr well north of the city - lots of Tesla north of 407
Correction to my earlier post - city transformer base in work - not completed - Stalls getting wired up
Dropped by the SC today - Team is connecting the stalls. City transformer pad is built- no Transformer installed yet
likewise I see many in that area - especially on HW 7
Still awaiting the drive from coast to coast that was to take place last year with a Tesla and no driver interaction - yes there has been a lot of...
A little bird at the Markham II site - mentioned that a fence would be put up to protect the stalls from the traffic entering and exiting the...
All 20 stalls are on their mounts - team is pulling cables - one side done now - halfway on the second side working from the stall with the most...
we aim to please
Half the SC cabinets have been installed - most on the east side of the entrance road - one on the west by the SC and transformers. No cables...
Whats is with GVAP 247 ? why do that to the community - u know that others need power and u dont ?
Looks all ready - all cleaned up and ready for activation
teams busy backfilling with dirt - no cables pulled, no cabinets
progress is now crawling - team pulling cables into the switch cabinets - no other cables pulled
Must be Heartland, its so logical. then again there are two in Markham within 5 km. then again SmartCentres Mississauga (Meadowvale) looks great
Looks like a ton of cosmetic work still to plus inspection
I drove by at lunch - zero progress - no cables pulled - no pedestals - nothing
add to that Markham II and Belleville - construction is going into high gear well before July
most likely they are pulling the cables - they are doing the same at Markham II - install then pull cables
you also have Pickering and soon Bellville