You may well be aware of this, but for the benefit of those who don’t: strictly speaking, the PW2 doesn’t backup a phase. It can provide backup...
And looking at your checkin time, it was my wife who was not so careful with the activation when you were there. :) Sincere apologies again for...
Maybe think about it for a little longer. Purely? Is an Autopilot mile the same as a non-Autopilot mile? Is there no selection bias here where...
Too much self isolation.
If you can fit the Gateway2 next to the meter box, I’d put it there. No need to move the solar panel stuff around then, just the sub-board...
Have you tried shutting off the main supply switch in your switchboard to simulate a grid failure? Whatever is still running after that will be...
It is the option presented under Designing for Essential Load Backup here: System Design | Powerwall Support How is your's set up? Backing up a...
No, it does not supply power across all 3 phases in a blackout. Nor does it (necessarily) have to backup everything you have on one phase, which...
That’d be $420/day, $40K/qrt.
FWIW, I've used scheduled charging on a controlled load circuit without issue* since taking delivery. I've never had to plug in while the circuit...
Something like this will do the trick: Gen2 Mobile Connector Adaptor (Model 3/Model S/X 'Raven') - EVchargers - EV cables and adaptors (You'll...