I don't have the answer to your actual question here, but wanted to say I have the Backup Gateway (not Gateway 2) and was approved without the...
Excited for you!
Aren't you making the change on the app itself? Sorry if i'm misunderstanding; where are you looking for the setting to "show up"?
The PG&E Rate plans are different: TOU-B has M-F 4-9 Peak TOU-C has all days 4-9 Peak If forced to move to TOU-C then it takes some comparisons...
Set your peak period to 4-9 pm, then click the Off-Peak button and it should take up the rest of the day. If you see any gray area that is trying...
Every clarification / missing information nasty email from PG&E has this in it: --------------------------------- Once the RRF is approved, you...
I didn't use greenbutton data to make my decision about how many PW. I knew I wanted full home backup and it was a new to us a 2 story house with...
I have this sense of impending doom that my Step 2 application submitted in 2019 is going to either ultimately be denied or told that I am kicked...
I agree i was fortunate to have a design team that worked hard for what I wanted. I was adamant about having whole home backup. When I replace my...
This is my setup. (photo taken before the conduit installed between the PowerWalls and the Load Center.) The large panel on the left is the Load...
For your generator you likely have an interlock to prevent backfeeding to the Grid. PG&E may not recognize that PW hardware / software is...
Somehow all the nameplate rating of my sources are listed as REGF and yet the second box on Appendix I is checked. If you want to see this PM me...
Does this section exist in your NEMMT agreement? Section 8.1 is the insurance requirements [ATTACH]
I don't have an EV and don't have any immediate plans to get one. The last year and a half has been very challenging to track because it doesn't...
Today I read through the tariff sheets. It turns out i'm on TOU-B (M-F 4-9 pm Peak , Sat, Sun and Holidays are all Off-Peak) For EV2: Peak is...
I'm not getting more, my SGIP Large Scale step 2 application is for the 3 that were installed in 2019. I'm guessing here the difference is Equity...
Will do, I don't have an EV so I don't see how going onto an EV schedule would be beneficial to me. If PW grid charging at night was allowed.......
I have 12.6 PV system (July 2019), 3 PW (Dec 2019 - PTO July 2020) and in process for SGIP Large Scale Step 2. I'm on NEM-MT but have TOU-C as my...
I was following this thread of comments:[ATTACH] During the review of my interconnection agreement (late 2019, early 2020) I was told that I'd...
I have the backup gateway and was able to avoid the NGOM additional meter (PG&E) after the UL listing was approved.
Third party Tesla Installer never mentioned insurance, nor did I have to provide any proof No mention of Stormwatch (installed Dec 2019 was that...
I have a 12.6 kW PV system and 3 PWs My PG&E account says: CURRENT RATE NEM2MT My Detailed Bill says: Rate Schedule: ETOUBRB/NEMPS I had a...
I can't modify my previous post but I'll update that I pulled my numbers from the Tesla App quickly and I believe fell victim to how that data is...
Yes - gas heat, clothes dryer, and range
My 2020 totals were: Solar Produced: 14872 kWh Home Usage: 17993 kWh From Powerwall: 5115 kWh From Grid: 6037 kWh To Grid: 2107 kWh Peak Only:...
I'm using the time-based control on Balanced mode and for 2020 we took 3.4 kWh from the grid while exporting 175 kWh (i'm on PG&E TOU-C). My PV...
Do you have a reference or link to share that explains the 5 year / ITC relationship?
In my case it cost me nothing because I had an agreement with my 3rd party installer that we'd be doing a whole home backup with AC soft starts....
I have this on my 3 PW whole home backup. Lumin® : Responsive Energy Management Platform Off-Grid Mode lets you tell the system which circuits...
I agree with this but have accepted my fate. Not only is it annoying to have to switch the modes, it messes up the reporting of Off Peak / On Peak...
Did you apply for SGIP without ITC? Or were you in Large Scale Step 1? The estimate for 3 PW in large scale step 2 that my application is working...
It looks like it was .CSV so i'll be hitting my head against the wall if they were too obtuse to accept that format...
Another round of frustration... [ATTACH] I gave them the "Green Button Data" in the same format I downloaded it from PG&E website... *sigh*...
The start of this true-up cycle and the "Complex Billing" was August 2020. I don't see any channel IDs that end in C, only two that end in A. So...
Thanks! I found those. I think part of the confusion here is that I was switched to a new service # (Not account #) when PW PTO / NEM was started....
I'm on the line with PG&E talking about issues with my bill and my service agent told me that many of the online usage / reporting features don't...
And to this point, if cycling it daily causes it to be lower than 70% at the 10 year mark (or another relative point in the lifespan) wouldn't...
My SGIP handler told me that they want to see a sustained load that matches the nameplate rating (or something like that).. so in this case: # of...
The saga continues... two punch list items 1) They want 12 months of PG&E data. When we first submitted I had only been in the house from February...
I think you are right there Vines... and my 3rd party installer only had one person who they furloughed at the beginning of COVID. Ironically they...
I'm not surprised that PG&E uses an outside company for the SGIP applications but it's the first time i've heard of it. Any replies that can be...
@heytae Why is TRC involved in your project / SGIP application? Are they your 3rd party installer?
Personally I'd take it down and find another location on my property to plan a new tree.
I got another one of the "The SGIP Reservation Request Form application package for... is currently under review by Pacific Gas and Electric."...
Also on 1.50.1 in Central CA as of today
My PV + PW install included Lumin® : Responsive Energy Management Platform There are time based controls, manual control of monitored circuits...
Still on 1.49 in Central CA
RobbL - best wishes on getting that check! I am currently waiting to get unstuck in Large Scale (3 PowerWalls) in Step 2. For anyone who uses AC...
My installer just let me know they are hiring back the person they furloughed as a subcontractor. So there's hope that my SGIP file will get...
I have a Kill A WATT i could throw on each for a day to confirm, but would tend to agree. Not much I can do in that regard with a family of 7.