No, a simple addition of a sub panel would be a less expensive solution. Many times half slot breakers can be substituted to free up some slots....
I have a DC to AC ratio of 1.5 to 1 and see a little clipping. I still get the same performance from my 5.7 kW panels. It is important to remember...
Again I agree about needing to know the specific code issue which is needing to be addressed. Breaker slots can be solved when they add critical...
Is it an increase in the size of service or just a panel with a bigger busbar capacity?.Have they considered a line side tap? I agree with Wayne...
All those things are possible with a generic Neurio but I do not know what Tesla allows access to in terms of functionality. I have a generic...
I do not think any CCAs have rate periods that are different than PG&E. Every time PG&E changes rates a CCA usually follows to be competitive....
I am on Sonoma Clean Power which is a similar CCA (Community Choice Aggregator). It is a good thing not a bad thing. PG&E tried to fight it so...
Yes, I would agree. I have not seen any examples of Tesla and tract builders working together.
I don't know if this is relevant to the OP's question but if there are additional facts such a SGIP rebate then that discussion somewhere on this...
Is the title correct? How is SoCal Gas involved with a battery storage rebate?
I saw a reference to RSD. How do SMA and Tesla accomplish panel level RSD?
Sorry if my responses seemed cryptic. I know this is a first for you but I have been seeing posts like this for years with the same variety of...
solarpaneltalk.com We would all like the IRS to agree with us. However in the real world I am just happy if they don't disagree or better yet, if...
Based on the feedback here and the responses on the other forum where you asked this question, I am still comfortable with my decision to have...
Each addition is an "original install" of that equipment. I interpret that statement to mean no double dipping or used equipment.
I have taken the solar credit as i have added inverters and batteries to my system. I am just a user and unless you want to request a letter...
I don't know what the process would be for gas. One alternative would be to cap off the pipes on my side of the meter. Unless there is a monthly...
For that and other reasons, I made the decision to not go for any rebate money which literally took PG&E out of the loop as far as my hybrid...
It is less than 36" but the install was approved and passed the final inspection in March 2019. If I face that dilemma in the future I would have...
My installer, Sunworks bit the bullet on that one. In the final analysis I have learned enough that I don't think upgrading the size of the...
That is good to know that parts of the system worked. From a friend who was familiar with the details of natural gas distribution the issue seemed...
44 weeks was nothing compared to my simple grid tie install which took over 64 weeks to get PTO. In my case they quoted a service panel upgrade,...
As others explained earlier, the Powerwalls are AC coupled to a grid tie solar system and the gateway isolates from the grid so the Powerwalls...
I have a friend in California who lost several micro inverters apparently to a surge. Since then he istalled a whole house protector on his main...
Most of Texas also does not belong to to any national interconnect. El Paso belongs to the Western Interconnect and El Paso did not have the same...
Here are some insights i did not know about the Texas energy market. Five things to know about Texas's strained electric grid They do not belong...
If you are talking about CVRP, my ex wife did six months ago.
That is worth a try. In many cases the panel detail might be there but not mapped to a specific location on your roof. I have one like that and...
Apparently not from everything I have read. I do not have a Tesla system but i have several Solaredge systems and I rarely look at that detail....
I have been trying to optimize my true up and that means keeping my NBCs about equal to my Minimum Delivery Charges. Most of my charging is done...
I think charging an EV from storage is sub optimal anyway so not an issue for me. I do have a small 20 Amp receptacle on the backup side so if the...
Okay, that makes sense, but then it is fed from your main service panel, correct? Instead of a "noname charger" how about what one electrician...
I don't see anything on that panel that would suggest why you could not install another 50 Amp breaker. The main breaker is 200 Amps and there are...
I installed solar on a newly purchased home so there was no history. I told the installer what size system I wanted and that I would be charging...
Then track your bills and don't worry about generating too much electricity. The rates are going up and the time periods are becoming less favorable.
I agree with @jboy210. It also depends on the rate trends and how much of a hedge against erosion of NEM benefits you want. Are you with SCE? The...
The ones about wind farms are mostly about killing birds. One was from an organizations that gets their funding from some pipeline owners and it...
I have a long time friend that lives in Texas and he continually sends me information about why wind energy is bad. I finally pointed out to him...
I agree with @getakey that my first priority is to eliminate drawing grid power after the sun sets. My second priority is to self consume as much...
I think Tesla has a maximun number of 30 Amp circuits per Powerwall. Would it be easier to decide if you described them as critical loads or some...
I never backfeed my solar system and the output of the solar system is always routed to the main breaker, . My Solar ready panel contains a 200...
It is going to take more thzn code change. We need EV friendly utlity rates. I own an apartment and let one of my tenants charge from a circuit on...
What I would like to see is an effort to reduce the administrative costs of installing those systems. I don't know if the material costs have much...
Haha, you are both correct. 20 Amp continous, 30 Amp breaker.
I use that timer and I think it has memory for settings
More importantly, we don't even have to ask their permission. They and the other power companies are happy to send is as much power as our sevice...
The minimum voltage of the inverter does not mean the optimizers are useless. I have a string inverter without optimizers and it doesn't work...
I have never seen that happen with SCE or PG&E on the few instances where a circuit was turned on before PTO. However there are many other...
There is a difference between 1741 and 1741 SA. Those two letters are important to know which version. Both descriptions may be correct. It would...
The only thing I know about the question of 3 or 4 CTs is some hobby experience with using a Neurio. Generally one CT per phase is what is done....