Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Search results

  1. H

    Range Loss Over Time, What Can Be Expected, Efficiency, How to Maintain Battery Health

    One more data point. I have a June 2019 SR+ with 10K miles. It charges to 212 at 100%. I am in Las Vegas, so high ambient temperatures in summer.
  2. H

    Tesla Neo Gateway not working after new router

    OP try power cycling 1) disconnect (wait 30 seconds) and reconnect power cable to tesla solar gateway (small black box). A red light on the gateway will indicate no signal. 2) go to your panel and find a 20 amp circuit breaker labeled power blaster. Turn it off, wait 30 seconds and then turn...
  3. H

    A very good Solar only (8.16 KW) install experience in Las Vegas

    If you can work with installer as suggested in previous post that will be great. Since you have not lived at your installation location for a 12 consecutive month period, you can use alternative system sizing method. NV Energy allows to size a system using up to 2.8 watts per square foot of...
  4. H

    A very good Solar only (8.16 KW) install experience in Las Vegas

    Despite plenty of sunshine, currently from incentive point of view, NV is not a friendly state for residential solar. For a typical solar only installation, besides federal solar tax credit, there are no incentives from State, County or City (no SERC). Even property taxes increase as a result...
  5. H

    A very good Solar only (8.16 KW) install experience in Las Vegas

    Congratulations on your install. You are almost there. Solar only installs are lot faster. Because of extremely high system reliability (0 down time in past 14 years I have been living in this town), no hurricanes or fires (area is prone to earthquakes though), and reasonable cost with in the...
  6. H

    A very good Solar only (8.16 KW) install experience in Las Vegas

    Order and Installation: Ordered the system in first week of August 2020. Installed in first week of September (original date was mid-September but an earlier date became available). This is a solar only system with 24 (340 W) panels and 7600 SE inverter. Design changes: I was able to...