I had a recent 16kw solar panel install with 2 powerwall 2s, inspection passed but I’m still waiting for PTO from national grid. On the app it looked like the powerwalls were charged to ~25% during the install and then gradually bled down to 0% over the past 3 weeks. I had storm watch turned on...