    Supercharger - Baltimore, MD

    Close, but no transformer, thats usually a holdup.
  2. Syd

    Supercharger - Mechanicsburg (Upper Allen), PA

    Yes, when the cabinets are between the stalls, it's prefab. Build in place has placed the cabinets separate and by the transformer.
  3. Syd

    PennDOT sent me an updated title?

    They standardized the nomenclature for fuel. My 2015 S that I got a new title for said "0 cylinder engine" as they had no electric type at all then.
  4. Syd

    Supercharger - White Plains, MD

    Hope springs eternal, but I tried zooming in on the meter and I didn't see numbers on it, so was it powered?
  5. Syd

    Supercharger - Breezewood, PA - Lincoln Highway

    Yes, thats a pre-fab, notice that the cabinets are located next to each four stalls, not in a separate area.
  6. Syd

    Supercharger - Cape May, NJ

    @Bighorn, you really need to understand and plan differently for v2 vs v3 superchargers. A V2 is only 150kw shared between the A and B pedestals. As was said above, if you have a choice, don't take the same 'number' as someone else. V3's share differently across all of the pedestals. If...
  7. Syd

    New Tesla Store Location Coming to West Chester, PA - 2022

    The West Chester Service center opened a couple of weeks ago. It's ramping up its run rate. Some of the techs at the site moved over from Devon.
  8. Syd

    Supercharger - Syosset, NY

    No recent picts, is there a green transformer (or one painted another color :-) ), and is there a meter in the meter box?
  9. Syd

    WV Tesla Owner's Society

    Once you get 30 members willing to form a club, you can start the process of converting to a Telsa Partner Club. (Like DVTOC). For that don't know the list of Tesla Partner Clubs is at engage.tesla.com
  10. Syd

    NEMA 14-50 Outlet Install near Devon, PA

    This is the kind of question our members ask on our discord server, I'm glad you got responses. We can be reached at dvto.club and are the partner club of Tesla covering SE PA, NJ and DE.
  11. Syd

    New Tesla facility in King of Prussia, PA

    According to my sources it's collision only right now.
  12. Syd

    Supercharger - Bridgewater, NJ

    you'll notice the transformer is still missing (the pad to the left of the cabinets). Now in the hands of the utility.
  13. Syd

    Supercharger - Fairmont, WV

    The old switch gear isn't used in a V3 site. The switch gear is now packaged into the cabinets, thus my comment. I'm glad it's a v3, I just don't understand why the non tesla switchgear cabinets. (could be local code requirements)
  14. Syd

    Supercharger - Fairmont, WV

    those gray cabinets look like the old style switch gear cabinets, not the V3 supercharger cabinets, are these more pictures?
  15. Syd

    Supercharger - Fairfax, VA

    Anywhere from several weeks to many months. It depends on a lot of things. How long does it take the power company to deliver/install a transformer is a major one. Electrical inspections and corrections are another. The actual build of the site can vary from a couple of weeks to a month...
  16. Syd

    NY fron License plate/ Tesla not letting me put License plate holder I brought??? Can someone in new york state confirm?

    It varies by tesla model and comes from how the car was EPA certified. If it was certified with the plate holder on it, they are required to deliver it that way and you the owner can remove it. If it was not, it's optional. Now if a service center wants to 'wink wink' take it off for cars that...
  17. Syd

    Supercharger - Manorville NY

    The big things under the covers are the actual chargers (not transformers). Those cabinets include the electronics to convert the 480v 3 phase power to the DC feed for 4 pedestals. There is a cardboard covered pallet behind the white covers that contains the pedestals.
  18. Syd

    Supercharger - Shirley, NY

    not quite everything. There are those pipes sticking up to the right of the cabinets, that's where the transformer goes. That and the power feed from the utility to the transformer are stilll missing. You can see the pad with the plywood on top of it in one of the pictures.
  19. Syd

    Supercharger - Erie, PA - Perry Highway

    battery was warm but not 'prepped' it seems, the first ramp up part was used to fully condition the battery. Given the temps outside, not surprised.
  20. Syd

    Supercharger - Belt Parkway, Brooklyn

    that means they haven't been able to find a reasonable spot to lease with sufficient power feed. It could be a while......
  21. Syd

    Supercharger - Hamburg, PA

    Great report, often when you are farther away from the supercharger Tesla will not show it in the nav, I find if I move the map to the area where the charger is (zoom out and scroll the map), the red dot is there and I can select it that way.
  22. Syd

    Supercharger - Urbana, MD

    yup, that pad is for the "big green" transformer. You can see the wiring already there waiting for it. Now it's up to the power company.
  23. Syd

    Supercharger - Woodbridge, NJ

    Did anyone check for a permit? Is there a newer nearby V3?
  24. Syd

    Supercharger - Dobbs Ferry, NY

    Tesla only lists cities on it's website that are already open, or ones that are where they are seeking a partnership for putting in a supercharger. The 'planned' ones are pinned to the center of the map for the town name, not the location, as a location has not been negotiated, and once one is...
  25. Syd

    Supercharger - Princeton, WV

    If the transformer is in, they are connected via the wiring, as the transformer pad has the wires pre-pulled and the only connection point is the transformer. If the meter is unpowered, the issue will be an inspection by the power company or municipality to approve turn on. If the meter is...
  26. Syd

    Supercharger - Bel Air, MD

    Yes that big green cabinet with the cooling fins for the oil is the transformer.
  27. Syd

    Supercharger - Reading, PA

    no need to apologize, I'm not sure there is any official term. Either way, as i said, if they didn't do a pre-plan town name, they don't add it to that map until it's open.
  28. Syd

    Supercharger - Reading, PA

    ok, I'm used to calling it the charging location map or supercharger map. Sites don't show up there until open, unless they are a generic area (not a specific site, but a town name marker) where Tesla is seeking to open a charger.
  29. Syd

    Supercharger - Reading, PA

    There is that big empty pad in the middle, it's waiting on the transformer. (The other transformer and meter is for the existing building on the site. And what is a Tesla Find Us map?
  30. Syd

    Supercharger - Ephrata, PA

    No, Q4 target, there is no deadline.
  31. Syd

    Supercharger - Princeton, WV

    Wires running out of a pad is the transformer. That comes from the Utility and is one of the last things and can take a long time, especially if the Utility has to figure out how to get that much power to the location.
  32. Syd

    Supercharger - Chesapeake, VA

    That sign says 15 Minute general parking. It's not "ICE'd" per se, unless it's left there. Usually this is because there were not enough spaces under 'code' to reserve spaces specifically
  33. Syd

    Supercharger - Lodi, NJ

    The most common reason for 15 Minute General parking is that the location does not have sufficient parking spots without the ones converted to supercharging ones to meet zoning requirements. As such they have to mark them 15 minutes general parking, and they have the right to park there for 15...
  34. Syd

    Supercharger - Bealeton, VA

    ok, the two white covered Tesla Energy items are the supercharger cabinets (Chargers to convert AC to DC). The transformer pad is larger and more rectangular. The transformer is outside and not in a shed, it depends on air cooling. The meter is usually near the white smaller cabinets that...
  35. Syd

    Supercharger - Bealeton, VA

    there is a cocrete pad for the utility transformer, it's generally a big green irregularly shaped box, and is labeled with all kinds of markings but the KVA marking is a dead give away (V3 sites are often 500, 750 or 1000 based on the number of stalls).
  36. Syd

    Supercharger - Hamburg, PA

    Usual post, show a picture of the transformer and the meter, if not there, there is still a ways to go.
  37. Syd

    Supercharger - New Paltz, NY

    Yes, a powered transformer means its waiting for either inspection by the local municipality or turn on by tesla (or both).
  38. Syd

    Supercharger - Carle Place, NY

    I hate to be the perpetual pessimist, but I zoomed in on the picture and the transformer's wires are still sticking out from the pad on the ground, as such, there is one heavy lift left, the transformer from the power company.
  39. Syd

    Supercharger - Garden City, NY (Roosevelt Field Mall)

    I don't see a transformer near those V3 cabinets in the picture above, so soon is only relative. Is it elsewhere and I didn't see it?
  40. Syd

    Supercharger - Garden City, NY

    like all items, transformers are in shorter supply, and damaged ones from IDA will take priority. I suspect we will see more delays than normal installing transformers.
  41. Syd

    Considering Relo to NJ Area, looking for info

    The people to ask about this is our North New Jersey chapter. You can find the facebook group for DVTO and ask there as a non member, but if you do move, I suggest you join and set your default chapter to Northern NJ. (Alas, I'm in PA and totally different rates, etc.).
  42. Syd

    Supercharger - Garden City, NY

    I suspect thats a transformer platform, as in the picts I don't see a transformer, just the switchgear and supercharger cabinets. So still most likely a couple of weeks away. Utility provides the transformer and the meter.
  43. Syd

    Supercharger - Abingdon, MD - Woodsdale Road

    ok, easily missed, so it will be a bit yet.
  44. Syd

    Supercharger - Abingdon, MD - Woodsdale Road

    please look for the transformer and meter
  45. Syd

    State Inspection Montgomery County

    DVTO (Delaware Valley Tesla Owners Club - Home) posts a list that our members have used in the members section of our website, but Montgomery County, PA is very large and you gave no idea where you are in it, but personally I use the AAA in Willow Grove, quick, used to Teslas, and they don't put...
  46. Syd

    Supercharger - South Boston, VA

    perhaps because it shames someone into getting themselves in gear :)
  47. Syd

    Supercharger - South Boston, VA

    Need picture of transformer and meter, without out that, it could be a while.
  48. Syd

    Supercharger - Edgewater, MD

    The transformer in front (show near the stalls) is too small, so that is an existing transformer for the store probably. The pad is for the transformer for the superchargers, so still a while to go.
  49. Syd

    Supercharger - Edgewater, MD

    As I've said in other postings, did you see a transformer (I don't see one in the picture), no transformer - weeks to months out no meter - weeks out unless the jurisdiction is a pain on approvals then longer
  50. Syd

    Supercharger - Old Bridge, NJ