Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Search results

  1. S

    Supercharger - Las Vegas, NV - Arroyo Crossing Parkway

    Even though the official opening isn’t until next week, I just checked the NAV in the car and the supercharger is showing up.
  2. S

    Supercharger - Las Vegas, NV - Arroyo Crossing Parkway

    I think that photo in the tweet doesn’t show the last few chargers (out of frame on the left). Glad to hear it’ll open soon. I’m sure it’ll get tons of use!
  3. S

    Supercharger - Las Vegas, NV - South Decatur Boulevard

    Parking spots have been striped. More electrical contractors out there today working on things.
  4. S

    Supercharger - Las Vegas, NV - South Maryland Parkway

    Interesting the signs say 60 minutes general parking.... be prepared to be ICE'd I guess.
  5. S

    Supercharger - Las Vegas, NV - South Decatur Boulevard

    Stopped by today at lunch. Site is almost done, looks like all it needs is striping of parking spaces and commissioning. The transformer looks to be on site and installed. Confirmed 20 chargers. 19 along the wall of Planet Fitness and one by the transformers.
  6. S

    Supercharger - Las Vegas, NV - Arroyo Crossing Parkway

    Drove by today - the site is done except for restriping the parking spaces and the elusive transformers. This site has two. Since there are two banks of Tesla transformers at each end of the line of spaces.
  7. S

    Supercharger - Las Vegas, NV - South Decatur Boulevard

    Drove by during my lunch hour today… I only counted 18 charging pedestals. I don’t think they wrapped around the back of the building.
  8. S

    Supercharger - Las Vegas, NV - South Decatur Boulevard

    Permit here: Permit & Application Status
  9. S

    Supercharger - Boulder City, NV

    Because he is (was?) a board of directors member at the time the permit was filed. I believe is no longer on the board. No idea if it has started. I tried to look up the permit a few weeks ago using the address and nothing came up.
  10. S

    Supercharger - Las Vegas, NV - South Maryland Parkway

    Construction is underway. Took a ride by today and snapped these photos.
  11. S

    Supercharger - Las Vegas, NV - Arroyo Crossing Parkway

    Near the Party City and Mexican restaurant. The NE corner of Badura and Tenaya is where it is.
  12. S

    Supercharger - Las Vegas, NV - Arroyo Crossing Parkway

    Went and visited the site today. Definitely under construction. See pictures. I only counted 40 stands and/or concrete pedestals. The site might be 40 or 48, I wasn’t quite able to do a full count of the inverter cabinets. Also, please move the marker to the following lat/long 36.062266...
  13. S

    Supercharger - Las Vegas, NV - E. Twain Ave.

    It kills me that the aerial photo in that app is like ~20 years old. At 2:30 PM, Town Square, Convention Center, Cambridge, and the brand new one on S Fort Apache were full. The ones closest to this one are Convention Center and Cambridge. So maybe this is needed more than I thought.
  14. S

    Supercharger - Las Vegas, NV - E. Twain Ave.

    Yeah, when I was charging at the airport one a few weeks ago, most of the other vehicles around were Kaptyn or had Uber/Lyft stickers on them.
  15. S

    Supercharger - Las Vegas, NV - E. Twain Ave.

    Surprised they're putting all the extra "for the strip" chargers on the east side of the strip.
  16. S

    Supercharger - Las Vegas, NV - South Eastern Avenue

    Four new ones are across the aisle from the existing 12 ones originally built. (First picture is the original 12, second is the new four).
  17. S

    Supercharger - Las Vegas, NV - South Eastern Avenue

    Welp, according to the app, this site now has 16 stalls up from 12 as noted on supercharge.info. Time for an update. I don’t know when these came online but assuming it was recently, we’re now up to 64 recently added stalls in Vegas.
  18. S

    Supercharger - Las Vegas, NV - West Craig Road

    That guy has been busy flipping switches lately. That is 60 supercharger stalls turned on in the last week or so across three sites.
  19. S

    Supercharger - Henderson, NV - Paseo Verde Pkwy

    Got a quick charge there this afternoon.
  20. S

    Supercharger - Henderson, NV - Paseo Verde Pkwy

    Just in time for that huge blackout in this part of town!
  21. S

    Supercharger - West Henderson, NV - Las Vegas Blvd S (M Resort)

    According to the Tesla app and supercharge.info, this site is now online. 🎉🙌
  22. S

    Supercharger - Henderson, NV - Paseo Verde Pkwy

    It looks like it goes down to the first floor... which is employee parking I think. Not going there, don't need to raise the ire of their security team.
  23. S

    Supercharger - Henderson, NV - Paseo Verde Pkwy

    Happy Halloween. The site looks "finished" in that the cabinets all seem to be in place, almost all of the construction stuff is gone (just a few bags of Quickcrete remain). All the conduit on the floor below looks to be completed, and the feeder conduit from the main power source comes up to...
  24. S

    Supercharger - Henderson, NV - Paseo Verde Pkwy

    A friend of mine drove by today - the big white cabinets are placed on those I-Beams in the photo above. Looks like they are doing the wiring inside the cabinets and (presumably) wire them up to the individual charging units you plug your car into.
  25. S

    Supercharger - Henderson, NV - Paseo Verde Pkwy

    Another construction update - drilling through the floor and conduit on the level below.
  26. S

    Supercharger - Las Vegas, NV - South Eastern Avenue

    75 at that location, or 75 in the Vegas area in general? 75 in that parking lot would be ridiculous.
  27. S

    Supercharger - Big Bear Lake, CA (LIVE 28 Oct 2023, 6 V3 stalls)

    I agree the parking lot is a bit small. But it is right down the road from Tropicali. That place has great food!
  28. S

    Supercharger - Henderson, NV - Paseo Verde Pkwy

    And we have construction! @Chuq On the floor below, there is hanging supports for conduit.
  29. S

    Supercharger - Las Vegas, NV - W Charleston Blvd

    It appears to be a flat rate, no on-peak/off-peak pricing at this location. At least not yet...
  30. S

    Supercharger - Las Vegas (Decatur & Russell)

    Hi @Chuq, I apologize. I should have provided the lat/long in the OP. The SC will be in the currently vacant lot at 36.087, -115.209, north of Russell Rd along Decatur. I've double-checked with a source I have access to, and that is the location they are going to build the hotel and this SC.
  31. S

    Supercharger - Las Vegas (Decatur & Russell)

    A possible new 20-charger Tesla SC station, as part of the "Otonomus" (pronounced Autonomous) Hotel. Applied for a permit this week here. Permit is not yet granted (awaiting plans). Permit application states "EV Charging Station. Installation of (20) Tesla EV Supercharging Stations within...
  32. S

    Supercharger - Las Vegas, NV - South Eastern Avenue

    It looks like Tesla filed to expand this SC with four more chargers on 8/3/23. https://aca-prod.accela.com/CLARKCO/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=REC23&capID2=00000&capID3=01Y8Z&agencyCode=CLARKCO&IsToShowInspection=
  33. S

    Supercharger - North Las Vegas, NV (Craig & Losee)

    Also the current Vegas charging issue is probably everybody getting those emails from NVE saying their next bill is going to be $500 and they’re all about using up those free supercharger miles.
  34. S

    Supercharger - North Las Vegas, NV (Craig & Losee)

    They haven’t updated their permit info since April or May it seems. It looks like a manual task of uploading an excel spreadsheet to their website.
  35. S

    Supercharger - Henderson, NV - Paseo Verde Pkwy

    Drove by this morning, no activity.
  36. S

    front headlines flickering

    2023 Model Y - the passenger-side headlamp is flickering. I am wondering if this is a defect, or something else? The only thing I can think of is that the passenger side is the side close to a post in my garage the car pulls up close to, and the headlamp flickering was just an indicator of...
  37. S

    Supercharger - Henderson, NV - Paseo Verde Pkwy

    I checked on this site on the fourth floor on the North parking garage and we have a fence! Not sure how long it’s been there. No construction materials in sight though. The spots on the floor below were blocked off too (presumably because the conduit will be running on the ceiling of the third...
  38. S

    Supercharger - Barstow, CA - Tanger Way (LIVE, 70 V3 stalls)

    Drove by on 6/24, still have the new pedestals covered. No visible progress.
  39. S

    Supercharger - Las Vegas, NV - W Charleston Blvd

    Agreed these are going to get ICE'd. The only place to put them in the surface lot that would have not been ICE'd would have been the NE corner near Pavilion Center and Charleston. The furthest walk from the parking lot to the casino.
  40. S

    Supercharger - Las Vegas, NV - Arroyo Crossing Parkway

    This is a good hub for the SW side of town. Hopefully it has the solar cover to keep all those vehicles cool in the summer. Tesla has the telemetry about who is charging where in town. Right now the only SC for the entire SW part of town (south of 215/west of I-15) is Town Square. If they...
  41. S

    Supercharger - Barstow, CA - Tanger Way (LIVE, 70 V3 stalls)

    Are they going to be installing the new magic docks on the chargers? Thats about the only reason I see to have the site shut down.
  42. S

    Supercharger - Henderson, NV - Paseo Verde Pkwy

    Yes, lots of chargers in Vegas in the next 6 months, I wonder if the new Durango station will also have an SC. That doesn't open until the end of the year, though.
  43. S

    Supercharger - Henderson, NV - Paseo Verde Pkwy

    Hmm. While I'm happy there will be an SC close to where I live, as a local, that is about the last place I would have wanted it to go - in a casino parking garage.
  44. S

    Supercharger - Carlin, NV

    One of the aspects of not building out those secondary highways is low utilization. However, if Tesla ships their V4 or whatever SC station with the CCS adapter, that would increase utilization over a V3 station because Tesla is probably the only fast L3 charging option on those routes, so...
  45. S

    Supercharger - Las Vegas, NV - 7400 Las Vegas Boulevard South

    OK done :) https://teslamotorsclub.com/tmc/threads/supercharger-west-henderson-nv-las-vegas-blvd-s-m-resort.282450/ The city of Henderson's online permitting portal is a bit difficult and slow to use.
  46. S

    Supercharger - West Henderson, NV - Las Vegas Blvd S (M Resort)

    City of Henderson - Permit Given Tesla's leak from the other day, we know this to be a SC station.
  47. S

    Supercharger - Las Vegas, NV - 7400 Las Vegas Boulevard South

    Slightly off-topic questions, are we allowed to start threads in this forum for the sites that were leaked last week? (click here if you don't know what I'm talking about, but I'm pretty sure you do ;) ) The lone site for Vegas was the M Resort (and today they just announced a big expansion...
  48. S

    Supercharger - Las Vegas, NV - 7400 Las Vegas Boulevard South

    The last time I was there, the parking lot on the north side by the EA station was completely full. Wonder how often the EA stations get ICE'd. There are also some L2 stations in that parking lot. Used them a couple of times with my Chevy Volt prior to my M3.
  49. S

    Supercharger - Las Vegas, NV - W Tropical Pkwy

    I checked the SC map through the app, and nothing there for this SC station. @ChrisInVegas maybe you can check it out this weekend.
  50. S

    Supercharger - Las Vegas, NV - Las Vegas Blvd. South

    I searched the Clark County permit system. I got really close - found a permit issued on 6/28/22 for new EV charging stations at an address matching one of the Town Square building addresses. But... Tenant name: Rivian Automotive So close! For those that are interested -...