Hello, I'm in the permitting phase for a 9.72 kW PV system installation.
At the same time, I've been getting quotes for the PowerWall 2. My goal is to have a grid-tied system AC connected to the PW2s, that can still charge and use the PWs when the grid goes offline.
Telsa says I need two PWs...