The install of my system isn’t ever showing power getting fed back into the grid, instead the Solar and Grid are added together to make the Home calculation.
I have a 400 amp service that is split into 2x200 amp panels. Only one of these is backed up with the Gateway 2. A Neurio is used to calculate the total load across both. This is where I think the problem exists.
One pair of CTs are used on the main feeder for the non-backed up panel, and another is on the backed up legs of the load center. These CTs are paired for the same phase. I suspect this is where the issue is... shouldn’t the CTs be on both feeders (one pair for the non-backed up panel, and the other on the feeder in the gateway)?
if anyone has a similar setup would they mind sharing the install
I have a 400 amp service that is split into 2x200 amp panels. Only one of these is backed up with the Gateway 2. A Neurio is used to calculate the total load across both. This is where I think the problem exists.
One pair of CTs are used on the main feeder for the non-backed up panel, and another is on the backed up legs of the load center. These CTs are paired for the same phase. I suspect this is where the issue is... shouldn’t the CTs be on both feeders (one pair for the non-backed up panel, and the other on the feeder in the gateway)?
if anyone has a similar setup would they mind sharing the install