5 battery install Lake of the Pines

Discussion in 'Tesla Energy' started by h2ofun, Mar 2, 2021 at 11:38 AM.

  1. h2ofun

    h2ofun Active Member

    Joined:
    Aug 11, 2020
    Messages:
    1,111
    Location:
    auburn, ca
    Here is a picture of the 5 30 amp battery disconnects. The two 60 amp inverter disconnects will be placed at the end of the PW's based on how the cable is running.
     

    Attached Files:

  2. Electrph

    Electrph Member

    Joined:
    Aug 29, 2019
    Messages:
    243
    Location:
    Central California
    :D blade disconnect city !
    maybe u can rent out that area for dramatic film scenes involving power plant control rooms ??
     
  3. h2ofun

    h2ofun Active Member

    Joined:
    Aug 11, 2020
    Messages:
    1,111
    Location:
    auburn, ca
    I will end up with 8 in the house, 5 batteries, 2 inverter and 1 generator. Crazy
     
  4. Electrph

    Electrph Member

    Joined:
    Aug 29, 2019
    Messages:
    243
    Location:
    Central California
    ok so now i'm seeing you in a mad scientist lab coat at halloween flipping blade disconnects .. "it's alive!!"

    seriously though the relative complexity of your system is intriguing .. can't wait for photos of all final components
     
  5. holeydonut

    holeydonut Supporting Member

    Joined:
    Jun 27, 2020
    Messages:
    835
    Location:
    East Bay NorCal
    Whaaaa they removed the protective plastic film already?
     
  6. jhn_

    jhn_ Member

    Joined:
    Jan 21, 2021
    Messages:
    32
    Location:
    United States
    Huh. Is it a CA thing to have a separate blade disconnects for each Powerwall? We have only one for our three Powerwalls here in MA.
     
  7. Electrph

    Electrph Member

    Joined:
    Aug 29, 2019
    Messages:
    243
    Location:
    Central California
    #27 Electrph, Mar 3, 2021 at 6:06 PM
    Last edited: Mar 3, 2021 at 6:13 PM
    the extent of them seem to be a county requirement in some areas .. the ridiculousness of some of them has become the butt of jokes on some threads
    my specific CA county system completed Dec 2020 required only one giant blade disconnect outside for whole system (individual breakers inside garage in TEG were apparently adequate for each powerwall)
     
  8. holeydonut

    holeydonut Supporting Member

    Joined:
    Jun 27, 2020
    Messages:
    835
    Location:
    East Bay NorCal
    #28 holeydonut, Mar 3, 2021 at 6:15 PM
    Last edited: Mar 3, 2021 at 6:29 PM
    I wonder if they're going to mess with H2o and put the blade disconnects in a different order than his Powerwalls.


    Like his PWs are going to go on the wall like this: [1] [2] [3] [4] [5]

    But they could put his blade disconnects like
    [5]
    [4]
    [3]
    [1]
    [2]

    #stillbeatingthebladedisconnecthorsewhichdiedlongago
     
    • Funny x 2
  9. jboy210

    jboy210 Supporting Member

    Joined:
    Dec 2, 2016
    Messages:
    4,603
    Location:
    Northern California
    Yeah, that is bad. That is something the owner should do after the construction people leave. And post on YouTube:)
     
  10. jjrandorin

    jjrandorin Moderator, Model 3, Tesla Energy Forums

    Joined:
    Nov 28, 2018
    Messages:
    7,114
    Location:
    Riverside Co. CA
    Seems to be very county specific, at least right now here in CA. I also only have 1 blade disconnect, but I also only have 2 powerwalls. Perhaps the requirements change with 3 or more here? I dont know but may find out at some point as I might add another one at some point.
     
  11. h2ofun

    h2ofun Active Member

    Joined:
    Aug 11, 2020
    Messages:
    1,111
    Location:
    auburn, ca
    In nevada county it is 1 for 1 disconnect. Same for inverters
     
  12. h2ofun

    h2ofun Active Member

    Joined:
    Aug 11, 2020
    Messages:
    1,111
    Location:
    auburn, ca
    Was just able to log into the first TEG I hard wired. Fun about to begin. Will see if they can finish today. They worked 11 hours tuesday, and 12 hours yesterday. Solar panel guys are here to put in new inverter and change things around. BUSY!!
     
  13. h2ofun

    h2ofun Active Member

    Joined:
    Aug 11, 2020
    Messages:
    1,111
    Location:
    auburn, ca
    little by little
     

    Attached Files:

  14. h2ofun

    h2ofun Active Member

    Joined:
    Aug 11, 2020
    Messages:
    1,111
    Location:
    auburn, ca
    Well, they are done for a first pass. Batteries working. Now need to learn how to use. See if anything is impacted.
     

    Attached Files:

    • b7.jpg
      b7.jpg
      File size:
      361 KB
      Views:
      11
    • b6.jpg
      b6.jpg
      File size:
      339.1 KB
      Views:
      11
    • b5.jpg
      b5.jpg
      File size:
      416.3 KB
      Views:
      10
    • b3.jpg
      b3.jpg
      File size:
      428.6 KB
      Views:
      10
    • b2.jpg
      b2.jpg
      File size:
      270.8 KB
      Views:
      9
    • b1.jpg
      b1.jpg
      File size:
      273.4 KB
      Views:
      9

Share This Page

  • About Us

    Formed in 2006, Tesla Motors Club (TMC) was the first independent online Tesla community. Today it remains the largest and most dynamic community of Tesla enthusiasts. Learn more.
  • Do you value your experience at TMC? Consider becoming a Supporting Member of Tesla Motors Club. As a thank you for your contribution, you'll get nearly no ads in the Community and Groups sections. Additional perks are available depending on the level of contribution. Please visit the Account Upgrades page for more details.


    SUPPORT TMC