Has anyone adding a second system while on EV-A?
I currently have a 3.2kW system with two Powerwalls. My EV-A plan is good thru 4/2024. I’m trying adding a second 5.2kW system before NEM 3.0 starts.
Since EV-A is no longer available, will I get to stay on EV-A, or will I be forced to switch to another rate plan?
Thanks
I currently have a 3.2kW system with two Powerwalls. My EV-A plan is good thru 4/2024. I’m trying adding a second 5.2kW system before NEM 3.0 starts.
Since EV-A is no longer available, will I get to stay on EV-A, or will I be forced to switch to another rate plan?
Thanks