I want to add some EV changing stuff into my house while I still have the sheet rock torn apart. Looking for any experiences on my options.
Currently I have an empty generation 200amp panel. Am thinking of putting 3 60amp breakers in it for 3 EV charging stations in my 3 car garage.
I assume I will need to get permits for this. Since it is on the output of the Gateway, I am assuming no issues with my down stream generation panel
for the batteries and solar, generator transfer switch or house subpanel.
Is it possible to wire this but not put the charging heads on now and pass a code inspection?
Any options on best EV charging head?
Anything else I should consider before doing this?
When do folks normally charge their cars? When there is no solar? Does one draw from the battery?
Currently I have an empty generation 200amp panel. Am thinking of putting 3 60amp breakers in it for 3 EV charging stations in my 3 car garage.
I assume I will need to get permits for this. Since it is on the output of the Gateway, I am assuming no issues with my down stream generation panel
for the batteries and solar, generator transfer switch or house subpanel.
Is it possible to wire this but not put the charging heads on now and pass a code inspection?
Any options on best EV charging head?
Anything else I should consider before doing this?
When do folks normally charge their cars? When there is no solar? Does one draw from the battery?