You are using an out of date browser. It may not display this or other websites correctly. You should upgrade or use an alternative browser.
My Gateway is inconsistent at what level it commands solar to start generating again.
I'm currently is a PSPS. Once the Powerwalls are full and solar has been commanded off, it appears my Gateway normally commands solar to start generating again when the Powerwalls are down to about 97%. I have 2 solar generating systems. One is Rule 21 compliant and the other is not. Today when the power was shutdown at a little after 3 pm (my Powerwalls were 100% full) the solar didn't start generating again until the Powerwalls were down to about 90%.
What are the specific frequency shift steps vs Powerwall charge level that the Gateway should be stepping to?