oripaamoni
Member
Like someone mentioned earlier in the thread, it would be nice to know if the German equipment has arrived. I was thinking that was the reason for the 4 days shutdown, they may have been installing the equipment at the GF and getting it online.
The shutdown was in fremont, the german equipment is going in to reno.