Because Electrify America has only 3 chargers slated for i-80 (cheyenne to slc) and 3 for i-25 (denver to billings) and the only non-Tesla DC FC is a 50kW in the Jackson Town Garage, I've decided to push to build out fast chargers in Wyoming.
The first location I'm currently working on is in Afton with a single dual plug charger with 1 CHAdeMO and 1 CCS plug on a 125kw shared charger. Assuming the build out for that is successful, I'm going to build more locations in 2022 hopefully with grants from the infrastructure bill if it passes through Congress.
Any thoughts or opinions or recommendations on sites is welcome. I have ideas for next towns to site, but a lot will depend on where I can get partnerships for land (like with convenience stores).
The first location I'm currently working on is in Afton with a single dual plug charger with 1 CHAdeMO and 1 CCS plug on a 125kw shared charger. Assuming the build out for that is successful, I'm going to build more locations in 2022 hopefully with grants from the infrastructure bill if it passes through Congress.
Any thoughts or opinions or recommendations on sites is welcome. I have ideas for next towns to site, but a lot will depend on where I can get partnerships for land (like with convenience stores).