Ordered my M3, hired an electrician to assess home charging options, and he concluded the best option was to install a transfer switch to utilize the clothes dryer line. Sounded good to me. Alas, he calls back to say the building inspector would not approve a transfer switch set-up. So my only option is a dedicated circuit that will cost over $2300 and come with installation and home appearance negatives. Evidently this is a local building code issue. Am bummed and have thought about canceling my order, but I guess that is a $3500 loss. Will call the building inspection folks and hope for a different answer. Have others encountered building code issues?