Anyone who installed Tesla solar with PW+ and backup switch got PTO from JCP&L (First Energy) in NJ ? I have Tesla solar roof (15kW with 3PW+) installed last November and passed inspection this Feb and waiting on PTO. Tesla told me my interconnection application got rejected since backup switch and meter are same place but our backup switch is installed in different box so I am confused.