I recently purchased a box of CQ.UK 3.0 and was confused on how long to wait before applying additional layers.
The tips page says "Additional coats may be applied after 60 minutes or wait until the following day if you are beyond 60 minutes".
However this site says "Additional coats may be applied with 45-60 minutes or wait until the following day if you are beyond 60 minutes".
I'm not sure which set of instructions to follow as the first one is directly from the manufacturer but is contradicting.
The tips page says "Additional coats may be applied after 60 minutes or wait until the following day if you are beyond 60 minutes".
However this site says "Additional coats may be applied with 45-60 minutes or wait until the following day if you are beyond 60 minutes".
I'm not sure which set of instructions to follow as the first one is directly from the manufacturer but is contradicting.