My site inspection was last Tuesday, 2/23. The day before, I requested a design change to go to a larger system than 4 kwh. It's been silence from the Project Advisor after I requested the design change on 2/22. Should I escalate this delay? Or, is this even a delay? I get the daily SMS that I have pending items in my accounts which is due to me not accepting the 4 kwh design.