So i have a reservation on the Cyber truck and we are finishing our basement. What kind of power should I run to prepare? The cost of running it now will be a lot less than if the basement is finished.
What should i run:
2/3/4 or 8 gauge wire?
Size of circuit breaker (in amps)?
receptacle at the end (NEMA 14-50)?
What should i run:
2/3/4 or 8 gauge wire?
Size of circuit breaker (in amps)?
receptacle at the end (NEMA 14-50)?