History is littered with failed EV companies that put social issues ahead of the bottom line. I find Tesla's approach of actually having a working business model both refreshing and necessary. Tesla still gets heat for building a "luxury" car rather than an affordable one for the masses right away, but the wisdom of this choice has become clear. They are accelerating the advent of sustainable transport under the constraint that they need to be profitable and survive. I trust they are making the right decisions as far as that goes.
Ok so we have reached Decemeber 1st with Kingston not up and running. This is more than a little distressing. Presumably it's a simple matter to hook up. How do we make some noise and get this happening?
The crew that installed the SC's busted their butts to get done quickly and efficiently. It seems crazy to me that the project is now at a complete stand still. Is this a scheduling issue? Equipment? Hydro? Inspection/permit?
Montreal Update:
Based on Kingston install, it look like it would be fully connected by opening night friday.
While I was there, they started install the Tesla Logo !!!
General view of the front of the building. They kept the metal cover where the underground cable terminated. I don't think they will dig cross the street, install the pipe, refill everything and fix the sidewalk by Friday ! Either this SuperCharger won't be fonctionnal, OR it can be powered by the current they already have going into the building. It only 2 stall, so maybe they can. Worst case senario, they rent a generator, but it would more than suck if people end up filling their car with electricty from gasoline.
The transformer is in place but the ball is back in the builder's court for metering requirements before the City can flip the switch. I am trying to get an update from the developer.
No Barrie would indeed be bad news. I can often get to the cottage driveway in Muskoka but not within "extension cord distance" of the building. The round trip is out of the car's range, and stopping in Orillia or Barrie Level 2 sites just robs me of the limited weekend time I have to spend there.
No Barrie would indeed be bad news. I can often get to the cottage driveway in Muskoka but not within "extension cord distance" of the building. The round trip is out of the car's range, and stopping in Orillia or Barrie Level 2 sites just robs me of the limited weekend time I have to spend there.
Montreal isn't functional yet as of 11:10...
Drumm will be up and running way before the holidays... trust me
And I'm at the Best western in Kingston, coming from Montreal (stop at Cornwall to top off the batteries)... Charging at 40km/h...
I'm quite frustrated that the SC is almost ready, but not plugged yet. I'm sitting at Tom's Place (snack bar next to the Best Western) in front of the fireplace, so the 3h wait could be worse...
Going back to Montreal on Sunday... Could you join me and pray that the SC will be up by then (let me dream a little!).