Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Erie, PA

This site may earn commission on affiliate links.
Not really, VT has two stantions per parking space, one for the front, one for the rear, lined up so the drivers side works

Erie's picture seems to show one stantion per parking space. Lined up for one side only, if you use the back you need to park incorrectly based on the lines for it to work.
 
Not really, VT has two stantions per parking space, one for the front, one for the rear, lined up so the drivers side works

Erie's picture seems to show one stantion per parking space. Lined up for one side only, if you use the back you need to park incorrectly based on the lines for it to work.
Burlington VT has the same setup.

Or Kingston, ON, Canada:
image.jpeg
 
To clarify, are you saying that the worker stated there would be a press event there today? <Tuesday, May 24th/16>

To Clarify - I said - "the worker stated", but as we can see - there may have been some misunderstanding, as it does not seem they would bring the press there if the Charging Stall Heads are still bagged!

Also - As to his job, he was surface Coating the Parking Spots, after he removed the Snow Fence Guards around the Stalls, while others were working on the Power Units Enclosure - I did not speak to these people, sorry.

Edit - Panoramic Shots added.
 

Attachments

  • 20160524_104302_Sealing-Pavement_Truck-Trailer_800x482.jpg
    20160524_104302_Sealing-Pavement_Truck-Trailer_800x482.jpg
    96.6 KB · Views: 89
  • 20160524_104507_Rolling-up-Snow-Fence_800x482.jpg
    20160524_104507_Rolling-up-Snow-Fence_800x482.jpg
    72.6 KB · Views: 83
  • 20160524_104439_Stalls-Bagged_and-Enclosure-getting-built_800x482.jpg
    20160524_104439_Stalls-Bagged_and-Enclosure-getting-built_800x482.jpg
    81.3 KB · Views: 85
  • 20160524_104702_Panoramic_Cracker-Barrel-Superchargers_behind-Vehicles_1200x300.jpg
    20160524_104702_Panoramic_Cracker-Barrel-Superchargers_behind-Vehicles_1200x300.jpg
    65.3 KB · Views: 89
  • 20160524_104747_Panoramic_Superchargers_Behind-Vehicles_Hilton-Gardon-In-Lobby_1200x306.jpg
    20160524_104747_Panoramic_Superchargers_Behind-Vehicles_Hilton-Gardon-In-Lobby_1200x306.jpg
    76.5 KB · Views: 80
Last edited:
Power company hookup and Tesla final inspection are all that remains. Would expect it online this week.

I wonder if it'll get snazzy T logos painted on the newly sealed parking spots?

I'm guessing the power is already hooked up since the meter is powered (see earlier picture)
We stopped by earlier today, around 2pm and there was no change or activity.