Had the Solar Roof Installed which ended up oversized 50%.
PTO Net Metering draft says: "The system production is larger than your annual energy usage. The system size must be reduced prior to FPL approval." Took a look at the checklist on Tesla website and "approval to install" was never checked off. Solar Roof was completed over a month ago.
Can anyone provide insight on this?
PTO Net Metering draft says: "The system production is larger than your annual energy usage. The system size must be reduced prior to FPL approval." Took a look at the checklist on Tesla website and "approval to install" was never checked off. Solar Roof was completed over a month ago.