TMC is an independent, primarily volunteer organization that relies on ad revenue to cover its operating costs. Please consider whitelisting TMC on your ad blocker and becoming a Supporting Member. For more info: Support TMC

Funds made available by Michigan to install DC Fast Chargers - RFP

Discussion in 'North America' started by Evoyager, Jan 5, 2020.

  1. Evoyager

    Evoyager Member

    Joined:
    Sep 8, 2016
    Messages:
    81
    Location:
    Keep the wind at my back
    Michigan Department of Environment, Great Lakes, Energy (EGLE)

    EGLE offers grants of up to $70,000 for EV fast chargers
    FOR IMMEDIATE RELEASE
    Dec. 19, 2019
    EGLE Media Office, [email protected], 517-284-9278
    Lisa Thomas, Clean Energy Engineer, [email protected], 517-282-6646

    Public or private organizations can apply for up to $70,000 each toward the cost of installing direct current fast chargers for electric vehicles under a request for proposals (RFP) announced today by the Michigan Department of Environment, Great Lakes, and Energy (EGLE).

    The rebates are aimed at encouraging the buildout of an EV fast charging network for automobiles and light-duty vehicles across the state. The goal of building out the state’s EV charging network is to improve air quality, reduce vehicle emissions, and protect public health and the environment.

    The grants are part of the more than $9.7 million allocated to Michigan from the Volkswagen diesel emissions settlement. Successful applicants can use their allocation for charger site preparation, equipment installation, networking fees, and signage. Applicants must be enrolled in a utility-sponsored charging program in the area where a charger is proposed to be installed. The EGLE grants are expected to cover up to a third of the total project costs with the host site and utility each also contributing a third.

    “We’re seeing fundamental changes in the transportation sector in Michigan with the move toward electric vehicles,” said Jack Schinderle, director of EGLE’s Materials Management Division. “Our grants – along with funding from our utility partners and host sites – will continue to expand the support network needed for a seamless EV user experience across our state.”

    Any public or private organization in Michigan, or those outside of Michigan that have demonstrated significant experience in installing and maintaining EV charging stations and have a significant presence in Michigan, are eligible to apply for grants. The RFP lists 75 eligible locations for chargers and proposed projects must be within five miles of those locations.

    Grant applications must be submitted online. Funding will be awarded on a first-come, first-serve basis until all the money has been allocated. For further information, contact the Environmental Assistance Center at 800-662-9278 or check the Michigan Fuel Transformation website for more information.
     
    • Informative x 3

Share This Page

  • About Us

    Formed in 2006, Tesla Motors Club (TMC) was the first independent online Tesla community. Today it remains the largest and most dynamic community of Tesla enthusiasts. Learn more.
  • Do you value your experience at TMC? Consider becoming a Supporting Member of Tesla Motors Club. As a thank you for your contribution, you'll get nearly no ads in the Community and Groups sections. Additional perks are available depending on the level of contribution. Please visit the Account Upgrades page for more details.


    SUPPORT TMC