I am preparing discussion with Tesla staffs of on-site visit. Ordered 9.6KW system with 2 power walls. 7.6KW inverter. 400W panels
Total 24 panels in 5 groups and 5 directions. Per PVwatts.nrel.gov, the North group (10) and East group (2) have bad efficiency (73% &78%). Central group (3) has 100% efficiency, West (6) 95% and South (3) 98%.
My concern is the East (2) string. It is too short for its own MPPT. It will be in shade half day. Can Tesla group it in other strings without hurting system efficiency? Shall I drop it? A layout change will cost me weeks of delay.
Appreciate advice on MPPT/Strings configuration for my case from all the experts.
Total 24 panels in 5 groups and 5 directions. Per PVwatts.nrel.gov, the North group (10) and East group (2) have bad efficiency (73% &78%). Central group (3) has 100% efficiency, West (6) 95% and South (3) 98%.
My concern is the East (2) string. It is too short for its own MPPT. It will be in shade half day. Can Tesla group it in other strings without hurting system efficiency? Shall I drop it? A layout change will cost me weeks of delay.
Appreciate advice on MPPT/Strings configuration for my case from all the experts.