So, my 10.2kw + 1 PW+ system order since Sept 2021 is still pending installation. The permit is finally approved 2 weeks ago but Tesla is giving me installation date of June 2022....I'm glad that NEM 3 date is being postponed now so I have more time, I almost gave up the project at one point.
I don't have an EV and plan to get one down the road, I have no idea when since I'm working from home and barely drive. I read that it's very painful to get EV charger installed after the solar system is installed. I have an old 100 A panel and a sub panel. Tesla design didn't call for panel upgrade and it's a whole house back up.
Since installation date is so far away, should I even think about getting one installed now, probably a NEMA 14-50 outlet or don't even bother. I would think Tesla will have to update their design documents and update the permit accordingly.
Thanks.
I don't have an EV and plan to get one down the road, I have no idea when since I'm working from home and barely drive. I read that it's very painful to get EV charger installed after the solar system is installed. I have an old 100 A panel and a sub panel. Tesla design didn't call for panel upgrade and it's a whole house back up.
Since installation date is so far away, should I even think about getting one installed now, probably a NEMA 14-50 outlet or don't even bother. I would think Tesla will have to update their design documents and update the permit accordingly.
Thanks.
Last edited: