Just curious, I have access to equipment required to produce this voltage/amperage as well as the power lines to supply it and was wondering if it is possible to run a quickcharge-like system at my business (which consequentially also has $0.04/kW industrial rates). Would using this as a primary system for charging damage the longevity of the electrical system?
Thanks.
Thanks.