Does anyone know if there is a process/forum through Tesla to request expansion or problems with the existing Supercharging network? The current supercharging capacity along I-15 through Utah. Going from SLC south to St. George, Las Vegas, California is a popular thing to do, especially in the summer, holidays and weekend. Last few years superchargers were ok with normally 1-2 open stalls upon arrival. (Only 6 in Nephi, 8 in Beaver and St. George). This is just inadequate given the amount of people on this popular freeway corridor...and St. George is a 20 minute detour off the freeway! This summer, on weekends, the chargers are 100% full with 15-20 minute waiting line at each stop. Going from SLC to Las Vegas take 6 hrs without charging, 7.5 hrs with charging (MS85D) but 8.5+ hours with my last trip to Las Vegas, having to wait 20-30 minutes in line for a charger at each stop and then only getting limited charging due to splitting charging with the A/B stalls. When I cross into the California line, I get 12-40 open stalls all along the I-15 corridor. As Tesla ownership continues to grow, we need to ensure we keep up with the supercharging capacity.