It was tested and everything passed. They did the testing with a generator plugged into the main input power feed (where the 13kV -> 480V transformer goes).
Peter
Peter
I'm puzzling about how they could have tested the facility without a full electrical hookup. The Rockville Service folks thought it would be ready 17 Jan, and were supplying a car for testing purposes on 16 Jan. Something must have happened that is hanging things up, but I haven't asked what of the Rockville folks. I suppose it will be along "soon."