Hello, I am new to the forum and hope to learn a lot more as I read the many posts already here. I signed up for Solar thru South Texas Solar Installers back at the end of June 2020. Solar Panels were installed mid November 2020. 48 Panels, Axtec AC-400MH/144s. This past week the (3x) Powerwall 2's were installed along with the inverters (under the panel array). Sunny Boy 7.0-1/ SP-US-41 (3x). I was told that there is a delay on the Gateway 2, so another 10-14 days to have that installed, the wiring, etc. My question is about the gateway, is there a delay? I haven't been able to find anything on the web... More pictures to come.