Yes but I wasn't able to get any picturesHopefully someone can provide pictures soon! Did you observe the construction yourself?
I went by there yesterday. It still looks exactly like the pics that were posted in the news article. No additional progress and no indication that there has been recent construction activity there.There seems to be a new supercharger under construction located at a Wawa on Hillsboro Blvd right off 95.
Can somebody possibly stop by and snap a few pics?
20 SW 12th Ave
Deerfield Beach, FL 33442
And how do u know all this?Stopped by for recent recon. Word is they will be open in 2-3 weeks. They have to upgrade the transformer nearby and either that or the V3 chargers they sent down were of the wrong type for our 480 volt 4-wire Wye power here.
They are wiring up for third-party chargers too maybe on the other side of the lot.
View attachment 495542 View attachment 495543 View attachment 495544
We appreciate the information. However, as was asked, it would be helpful if you could provide an authoritative source for your information.Stopped by for recent recon. Word is they will be open in 2-3 weeks. They have to upgrade the transformer nearby and either that or the V3 chargers they sent down were of the wrong type for our 480 volt 4-wire Wye power here.
They are wiring up for third-party chargers too maybe on the other side of the lot.
View attachment 495542 View attachment 495543 View attachment 495544
Thank you.There is no authoritative source. It's hearsay I picked up inside the store.
We appreciate the information. However, as was asked, it would be helpful if you could provide an authoritative source for your information.
Based on current photos, the utility transformer pad has been installed, but the transformer has yet to be installed and no Supercharger cabinets of either version have been delivered to the site.
Edited: After reviewing the conduit arrangement at the Clearwater Supercharger construction, which is a confirmed version 3 Supercharger based on the permit application, I have revised my opinion and now believe this is also a version 3 installation.
From the photos that have been posted, it appears that there are two concrete pads each with provisions for ONE Supercharger cabinet. So if there are a total of two Supercharger cabinets that would indicate that this is a version 3 Supercharger installation.
Here's a link to an article I wrote:
Deerfield Beach Supercharger discovered under construction at Wawa (Public)
Larry
Installation is up and running