This is an amazing forum, learnt a lot by reading through here but still have questions!
I have been spec'ed with a 12.24KW system with annual production of 11605 KWh
1. The inverter they have specified is a SE11400H-US. Is that enough without clipping or should I request two inverters?
2. The only document I see in my account is a customer layout. They did a site assessment before drawing this layout. They did send me some drawings to send my HOA but I have not had to sign anything and they have gone to the permitting step. Am I missing something here?
3. The tech drawing they sent for my HOA approval has a optimizer spec sheet, does that mean they will install optimizers on all my panels or only some of them? I will have shade.
I am sure I will have more questions, so thank you for your patience in answering!
RS