Credit for pictures and catch in Tesla Owners Group Kansas City Facebook Group. 8 stalls. 1 forward. @BlueShift
Is that in the parking lot of the Hy-Vee at 6655 Martway St, Mission, KS 66202? If so, using the radio tower as a reference, It's along the NE corner of the parking lot. Lat/Long: 39.0200000,-94.6611821
Per the facebook thread, that is the correct location. Should have included that info. Chargepoint stations are in the northwest corner of the same lot.
Great! This has been on the Tesla Supercharger map as coming soon, and looks like it actually will be here soon! I hope it is a supercharger as opposed to the 72 KW chargers at the HyVee by the airport.
It's definitely an urban-style supercharger, which is the type that is limited to 72 kW max. I guess this is the installation that Tesla had pinned as Overland Park? Based on type, location, and the other pin Tesla has on its map, this looks more like a supercharger that is envisioned to serve people living in the South KC area as opposed to travelers passing through KC. And, for travel heading north/south along I-35, the Olathe, KS location will likely (hopefully?) be a full powered station to serve that need.
A 72 KW urban charger in a suburban location makes sense. There are enough places close by for people to spend money that the extra time spent by consumers could eventually cover fixed costs. I hope you're right about the one planned for Olathe.
These are great, and I’m hoping the Olathe one is full powered and right off of I-35, they really need the Emporia Supercharger that’s been on the map for years to complete the interstate corridor through Kansas. Taking the turnpike from Wichita to Topeka works, but your SoC is too high on the reverse, you just haven’t drained enough electricity by the time you drive from Kansas City to Topeka to charge efficiently, but tough to make it all the way to Wichita without babying it, even on an S90D.
Looks like the same setup as the one near the airport, SuC in the NE corner, HyVee gas and convenience store on the west side. Even the same glass recycling behind the inconvenience store!
I was in downtown Mission this afternoon, so I felt obligated to go check in on progress myself. Fences were open, looked almost done!
Now that the Supercharge in Olathe is underway, I would say that this Mission supercharger is the "Overland Park" coming soon supercharger listed in Tesla's map, not in addition to that one. We should know soon enough.
I can't quite be sure with the framing in your picture, but it looks like the pad for the utility transformer is sitting empty over to the left (see highlight below). That transformer is often the last major hardware item to get installed before a site gets energized. So, if I'm right that that is the transformer pad, seeing that it's still empty is an easy quick-look way to tell that the site isn't operational yet. The other thing, which is more obviously missing, is the pedestrian light post(s); we can see an empty lighting base behind your car.
As of the morning of April 14, the transformer is installed and the construction tape is gone, but the area lights are still missing and there is still no power to the charging stations.
The juice isn't on. Just checked and the meter is installed but it's dead. Wonder what the holdup is. The lights are still not installed, but that's not really a problem.
Hope to see this open soon. I finally placed my Model 3 order today and I work in the area. Would be pretty convenient to have as an option.
Welcome to the Tesla family.... I should be driving through this area on May 20th, and if history continues to repeat, that means that this one should be done on May 21st.