Blue heaven
Fair Dinkum Tesla
So where would we put chargers to link Adelaide and Perth?
At the same locations that already have 3 phase power outlets supplied by the the TOCA/AEVA partnership, at this moment the gaps are no more than 225kms ( plugshare needs updating).
These locations have no shortage of generating capacity, enough to keep up with peak tourist times plus reserve in case of a generator shutdown ( I've seen 4 x 200kwh generators in one shed) it's now got to a stage that offsetting much of this diesel use with solar and batteries has long term financial benefits it's just a case of the each business "wising up".
The main problem is convincing locations that EVs are on the way and its time to add electric car charging to their business plan.