We are looking for some input on this proposed Powerwall layout using the Powerwall as the primary power source for the panel of selected circuits, also acting as a UPS for those circuits. Our goal is to recharge the Powerwalls using the grid or the generator as available via a traditional transfer switch. Any Thoughts?