It is hard to believe
Queensland Breaks Ground On 1.5 Gigawatt Solar Farm With 500 MWh Battery Storage | CleanTechnica
I expect news to shortly become just the price of the battery. The PV is thrown in as a freebie.
I do wonder though where the 0.5 GWh of battery is sourced. I presume it is from a factory not yet built.
Addendum:
Oops. Not 3 hour battery, 1/3 hour battery
Queensland Breaks Ground On 1.5 Gigawatt Solar Farm With 500 MWh Battery Storage | CleanTechnica
I expect news to shortly become just the price of the battery. The PV is thrown in as a freebie.
I do wonder though where the 0.5 GWh of battery is sourced. I presume it is from a factory not yet built.
Addendum:
Oops. Not 3 hour battery, 1/3 hour battery