Is anyone taking advantage of SMUD's EV pilot program?
I'll be part of the self managed group, and was wondering if I in fact need an EVSE (Electric Vehicle Supply Equipment). My plans were to run a dedicated 240 circuit (14-50) but am not sure if the EVSE is needed. Please advise...
Silver P85 Downtown Sacramento
I'll be part of the self managed group, and was wondering if I in fact need an EVSE (Electric Vehicle Supply Equipment). My plans were to run a dedicated 240 circuit (14-50) but am not sure if the EVSE is needed. Please advise...
Silver P85 Downtown Sacramento