Hi folks,
We are scheduled on Monday to have our solar installed after waiting almost a year-very excited.
A skeleton crew came out yesterday and shared that the install would now be using the Tesla inverters (3 of them) rather than the Solar Edge that was previously communicated (1x10k, 1x7.6k).
I’m told if I want to have solar edge I can but it would delay by weeks or months.
What would you do? I’m miffed that they made the change without telling me, and am concerned about the string vs. optimizers.
for context, this is a 61-panel install with 6 powerwalls.
We are scheduled on Monday to have our solar installed after waiting almost a year-very excited.
A skeleton crew came out yesterday and shared that the install would now be using the Tesla inverters (3 of them) rather than the Solar Edge that was previously communicated (1x10k, 1x7.6k).
I’m told if I want to have solar edge I can but it would delay by weeks or months.
What would you do? I’m miffed that they made the change without telling me, and am concerned about the string vs. optimizers.
for context, this is a 61-panel install with 6 powerwalls.