Ordered a 7.2kW system back on 4/14 and Tesla came back with an initial system design in <48hrs. However, the design has 4 panels on the North facing roof. I’d rather have all of them on the South facing roof and, based on another house with the same roof design and solar, it’ll fit. Problem is Tesla is saying a redesign will take 4-5 weeks.
Should I wait and lock down the design before “accept & credit check,” or move forward and have them make the change (if it’ll fit) when they do a site assessment?
Should I wait and lock down the design before “accept & credit check,” or move forward and have them make the change (if it’ll fit) when they do a site assessment?