It's happening!
3701 20th St E - Fife, WA
Rehab of an existing building. TI is supposed to take 10 weeks and be complete early November. Looks to be a large Service Center with Wash bay, paint booth and a small showroom showing solar and powerwalls. There will be 12 HPWC's and (2) V3 Stalls.
3701 20th St E - Fife, WA
Rehab of an existing building. TI is supposed to take 10 weeks and be complete early November. Looks to be a large Service Center with Wash bay, paint booth and a small showroom showing solar and powerwalls. There will be 12 HPWC's and (2) V3 Stalls.