I'm awaiting final engineering drawings from Tesla/Solar City for a 9.3k system with one Powerwall in zip code 75070 ($37k gross cost, including powerwall installation, before any tax credit or rebates for a 31 panel system).
I'm chafing right now because the final design is taking so long. Solar City estimated that I'd have the design one week after their latest site visit and it's now been five weeks and I'm still waiting. To make matters worse, they already designed the system a year ago, before canceling the installation because they weren't ready to work with my electrical cooperative. Supposedly, they're ready to work with them now but more than two months after the most recent contract signing and five weeks after the latest site survey, I'm still waiting for the final design.
My current plan is to wait just a little bit longer before I start calling other solar companies to do the installation instead.
I'm chafing right now because the final design is taking so long. Solar City estimated that I'd have the design one week after their latest site visit and it's now been five weeks and I'm still waiting. To make matters worse, they already designed the system a year ago, before canceling the installation because they weren't ready to work with my electrical cooperative. Supposedly, they're ready to work with them now but more than two months after the most recent contract signing and five weeks after the latest site survey, I'm still waiting for the final design.
My current plan is to wait just a little bit longer before I start calling other solar companies to do the installation instead.