Launch Date: 7/20
Launch Window: 5:00 PM EST
Launch Site: SLC-40
Booster Recovery: JRTI - success
Booster: B1058.2
Mass: 5-6 tonnes
Orbit: GTO
At 5-6 tonnes, it will be South Korea's first dedicated military satellite. Contracted by South Korea's DACA in 2014.
If B1058.2 launches anytime before July 23rd, it will be the shortest turnaround time on a booster at around 6 to 7 weeks.
Falcon 9 Block 5 | Anasis-II
ANASIS 2 (KMilSatCom 1, URC-700K)
Launch Window: 5:00 PM EST
Launch Site: SLC-40
Booster Recovery: JRTI - success
Booster: B1058.2
Mass: 5-6 tonnes
Orbit: GTO
At 5-6 tonnes, it will be South Korea's first dedicated military satellite. Contracted by South Korea's DACA in 2014.
If B1058.2 launches anytime before July 23rd, it will be the shortest turnaround time on a booster at around 6 to 7 weeks.
Falcon 9 Block 5 | Anasis-II
ANASIS 2 (KMilSatCom 1, URC-700K)
Last edited: