Meijer 800 Brown Road Auburn Hills, Michigan 48326 I believe construction begins this week. If anyone is in the area, please check the status.
Oh... This one is right at the exit that I take on I75 when going to my friends house in Lake Orion. Nice.
Wow, right in the heart of the automotive capital. Ballsy, Tesla! It's a great location though; remember dozens of grocery trips there with my parents when I was growing up
I'm going to assume after construction here is done the same crew will work on St. Clair Shores. Though I'm not sure that there's even a great parking lot location in that city. Seems like Tesla was just aiming for the 696-94 interchange.
Joel, I see that this location isn't yet on supercharge.info, even as a blue "permit" dot. Just a matter of time? And to add another "me too" to the conversation, I'm happy about this one because it's in a great general area for me; now I can reach some family on Lake St. Clair and make it home without a problem, even in the dead of winter.
The location that makes the most sense would be the Meijer at 13 Mile and Little Mack. Although it's technically in Roseville, it's right on the border of St. Clair Shores so maybe that's what they were thinking.
Nothing to report . Only equipment was for a large AC installation with crane. Being watched carefully by a security guard. Flags or survey marks were from previous repaving of parking lot a number of weeks ago. I will check it once a week till I can chat with someone.
Auburn Hills, MI Along Primary Interstates: I-75 Along US Numbered Highways (<=5mi): US-24 Along Auxiliary Interstates: None I-75: From: Toledo, OH - 85.4 miles To: Bay City, MI - 82 miles Diversion: 10.4 miles*/1.2 miles From: Maumee, OH - 107 miles To: Sault Ste. Marie, MI @Canada - 312 miles Neighbors: Port Huron, MI (I-75,MI-59,u,MI-59,u,MI-59,I-94): 63.0 miles Comber, ON, Canada (I-75,u,ON-401,ON-77): 67.7 miles Toledo, OH (I-75,I-75BL,u,I-696,I-275,I-75,OH-184): 85.4 miles Ann Arbor, MI (I-75,I-75BL,u,I-696,I-275,MI-14,US-23,I-94): 60.5 miles Lansing, MI (I-75,I-69,US-127): 82.5 miles Sheboygan, WI (I-75,I-69,I-96,u,MIWI-F-MM**,u,I-794,I-43,WI-23): 325 miles Wausau, WI (I-75,I-69,I-96,u,MIWI-F-MM**,u,I-794,I-94,I-41,US-45,US-10,I-39,US-51): 455 miles Wausau - Hilton Garden Inn, WI (I-75,I-69,I-96,u,MIWI-F-MM*,u,I-794,I-94,I-41,US-45,US-10,I-39,US-51): 454 miles Bay City, MI (I-75) : 82.0 miles * Fastest route from Toledo, OH to Bay City, MI is I-75,I-275,I-96,US-23,I-75, which cuts off 10.4 miles and 18 minutes. ** Muskegon-Milwaukee Ferry Data from Supercharge.info, mapping from Google maps and Supercharge.info
I noticed the permit on supercharge.info yesterday. That's the one supercharger I'm most excited about. Not that I have any intention to use it, but it would be the closest to home and in the same city as my brother. My brother has a Model 3 reservation and lives in an apartment complex near OU that refuses to install charging, so he's been waiting for that supercharger. He was kind of hoping/expecting it to be just west of the diverging diamond interchange, like maybe Crowne Plaza. I'll talk with him about it soon and find out if he'd be checking on the progress.
Is it in the parking lot between Meijer and Target? The middle section of that lot would be perfect as it is never full.
I'm building a house in Oxford Twp that I visit every weekend so I'll swing by every week to check on the progress.
I didn't see any evidence of an installation or planning this weekend. There were some orange flags in the ground marking the route of some kind of underground utility on the south side of the parking lot near the tire store, but I don't know if this is significant. It's difficult to determine where the installation might be since it's a pretty busy parking lot with many out buildings surrounding it.
I was there today and there are what appear to be superchargers wrapped up with an electrician trailer and red caution tape near the gas station.