    Things are looking promising for the planned Supercharger in Altoona, IA.

    I did a quick search of the city permits, and found an entry from 11/26/18:
    "KUM & GO - TESLA CHARGING STATION"

    Address: 1430 1st Ave N, Altoona, IA
    Google Maps


    Link: Permit Reports | City of Altoona, Iowa
    Go to 2018 Commercial Permits.
     
    • Like x 3
    • Informative x 1
  2. midwestLemur

    midwestLemur Member

    Joined:
    Nov 29, 2018
    Messages:
    65
    Location:
    Quad Cities IL
    Oh that's interesting. Sounds like maybe we'll get it in 2018 after all.

    It always seemed like the Hy-Vee just down the road from there was the obvious choice. Are the images on Google up to date? It doesn't seem like there's anywhere to eat near that location unless the Casey's across the street has some seating inside (some of them do).
     
  3. earcandy

    earcandy Member

    Joined:
    Aug 27, 2013
    Messages:
    27
    Location:
    Ankeny, IA
    True... not much around.
    Luckily, the Kum & Go is a new, nice location, with some seating.
    Google Maps
    Google Maps

    (and an Anytime Fitness across the street, to work off those Cinnamon Rolls ;) )
     
  4. mociaf9

    mociaf9 Active Member

    Joined:
    Oct 18, 2018
    Messages:
    2,388
    Location:
    CA
    @RobK, I think you had originally mistaken the Altoona, Pennsylvania install for Altoona, Iowa. But here you go, this will be the one in the right state and should help you out.
     
    • Like x 1
  5. RobK

    RobK Member

    Joined:
    Feb 22, 2018
    Messages:
    203
    Location:
    Overland Park, KS
    Thank you @mociaf9! This is indeed good news. Would love to see some pics, if possible.
     
  6. GleanerC

    GleanerC Supporting Member

    Joined:
    Jun 3, 2014
    Messages:
    34
    Location:
    McPherson, KS
    Grabbed these pics today while traveling through. Contractors actively working.
     

    Attached Files:

    • Informative x 2
    • Like x 2
  7. RobK

    RobK Member

    Joined:
    Feb 22, 2018
    Messages:
    203
    Location:
    Overland Park, KS
    This is fantastic! Wonder if they will make the YE date as posted on SC map. Thank you for the nice pics.
     
  8. crmatson

    crmatson Member

    Joined:
    Nov 9, 2013
    Messages:
    120
    Location:
    Iowa
    Beat me to it. I asked the worker about time frame and he said they are waiting on equipment and couldn't offer a date. He said he worked on the Bethany, MO and Shelby, IA locations recently. He said if they have everything, they could get a Supercharger station built in 5 days.
     

    Attached Files:

    • Like x 3
  9. mociaf9

    mociaf9 Active Member

    Joined:
    Oct 18, 2018
    Messages:
    2,388
    Location:
    CA
    Nice. It looks like they might already have the utility transformer installed (hiding in the backgroud of GleanerC's first picture you can see a new transformer and evidence of the recent trenching). So this site could potentially come on-line very quickly as the major long lead item might already be finished. The parking stall layout is a bit weird though. I would have expected the far left stall to be pull forward instead of back-in.
     
  10. MarcoRP

    MarcoRP @MontrealTesla

    Joined:
    Sep 6, 2017
    Messages:
    4,846
    Location:
    Montréal
    • Like x 1
  11. MarcoRP

    MarcoRP @MontrealTesla

    Joined:
    Sep 6, 2017
    Messages:
    4,846
    Location:
    Montréal
    Recent photos of Altoona on PlugShare. Construction finished, gates off. Looks like it will be ready before year’s end. 1619AA77-7EA0-42FF-867E-A7C50684203B.jpeg 5967E51F-C30F-4C4C-BADD-3B333EEBA986.jpeg
     
    • Like x 4
    • Informative x 2
  12. mociaf9

    mociaf9 Active Member

    Joined:
    Oct 18, 2018
    Messages:
    2,388
    Location:
    CA
    Waiting on the switchgear (that's a new one, usually it's the utility transformer that's the hold-up). Everything else looks done. After that gets installed and wired in, they'll hopefully be able to get final inspections done, have the meter released, and turn the juice on.
     
    • Like x 2
  13. DDarrow

    DDarrow Member

    Joined:
    Oct 10, 2014
    Messages:
    130
    Location:
    Iowa
    Is it just me, or is this taking way longer than usual?
     
    • Like x 2
  14. DMC5180

    DMC5180 Member

    Joined:
    Oct 13, 2018
    Messages:
    108
    Location:
    Reedsburg, WI
    I wonder If the Wooden enclosure needs to be installed around the 3 Supercharger units before it can go live also? It seems odd that these units aren't clustered on a common Concrete pad.
     
  15. BobIowa

    BobIowa Member

    Joined:
    Jan 24, 2019
    Messages:
    7
    Location:
    AltoonaIa
     
  16. BobIowa

    BobIowa Member

    Joined:
    Jan 24, 2019
    Messages:
    7
    Location:
    AltoonaIa
    Hi: I talked to the electrician today. They are wiring the switch gear to the chargers, May take a few more days because of the cold, but he said soon. 20190123_162005.jpg
     
    • Informative x 5
  17. MarcoRP

    MarcoRP @MontrealTesla

    Joined:
    Sep 6, 2017
    Messages:
    4,846
    Location:
    Montréal
    Better clear the snow as well
     
  18. BobIowa

    BobIowa Member

    Joined:
    Jan 24, 2019
    Messages:
    7
    Location:
    AltoonaIa
    Snow is gone for a day or two
     

    Attached Files:

    • Like x 2
  19. mociaf9

    mociaf9 Active Member

    Joined:
    Oct 18, 2018
    Messages:
    2,388
    Location:
    CA
    There won't be a fence/enclosure. Whether any sort of screen around such equipment, either fencing or landscaping, is required is a matter decided by local Planning/Zoning rules. it's not a hard rule enforced everywhere. From the layout, looks like it isn't required by this jurisdiction. It is a bit unusual to see the cabinets strung out in a line like that, but we've seen it done in other locations as well. I imagine it was done here to stay within the requirements of the site. The cabinets have to be located within a certain distance of the charging posts but setting them all on a single pad on available space somewhere within that radius would likely have interfered with the setback requirements or encroached on the sidewalk. Either that or have swallowed up an additional parking stall which might not have been acceptable to the land owners. etc.
     
    • Like x 1
  20. RobK

    RobK Member

    Joined:
    Feb 22, 2018
    Messages:
    203
    Location:
    Overland Park, KS
    Thanks for the update and nice "Before & After" pics. Hopefully Altoona, IA will show up on Tesla SC map, soon.
     

Share This Page

  • About Us

    Formed in 2006, Tesla Motors Club (TMC) was the first independent online Tesla community. Today it remains the largest and most dynamic community of Tesla enthusiasts. Learn more.
  • Do you value your experience at TMC? Consider becoming a Supporting Member of Tesla Motors Club. As a thank you for your contribution, you'll get nearly no ads in the Community and Groups sections. Additional perks are available depending on the level of contribution. Please visit the Account Upgrades page for more details.


    SUPPORT TMC