ChrisH
Active Member
Not sure about this location, haven’t been there lately either, but other malls have done this (Everett, alderwood, northgate, etc) as real estate gets more scarce and $$$
Crazy
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Not sure about this location, haven’t been there lately either, but other malls have done this (Everett, alderwood, northgate, etc) as real estate gets more scarce and $$$
Just the area near the Nordstrom Rack, which is apparently where they are putting in the chargers. The rest of the giant parking lot is pretty open, which was my point.Seriously? The parking lot is gigantic and it’s a crappy mall. It really gets that congested?
This looks more than a couple of weeks away. Construction cone? @BlueShiftThis might be open in a couple weeks.
Just the area near the Nordstrom Rack, which is apparently where they are putting in the chargers. The rest of the giant parking lot is pretty open, which was my point.
With traffic around here, I wouldn't be surprised if the crew worked 6am to 2pm.Yup. Drove by today and that’s how it looks. No one was working there at 3pm though.
Stopped by Tuesday around 1:30 pm. Only activity was a gaggle of contractors coordinating ongoing work. As usual they were tight lipped about schedule so I did not push it. Counted 12 conduits at the curb but 5 cabinets.
You can see that there's a spot with conduit stubs sticking up for an additional cabinet to be installed in line with the others. So, either there will be another cabinet delivered and this site will open with 12 stalls OR they are pre-running the conduit for a potential future 2 stall expansion and the site will open with 10 stalls.Counted 12 conduits at the curb but 5 cabinets.
Oops, meant to attach a highlight to point out what I was talking about:You can see that there's a spot with conduit stubs sticking up for an additional cabinet to be installed in line with the others. So, either there will be another cabinet delivered and this site will open with 12 stalls OR they are pre-running the conduit for a potential future 2 stall expansion and the site will open with 10 stalls.
Thanks, that helps my understanding!
Does the 2:1 pairing of stalls to cabinets mean these will be at least 120kw? Or do the 72kw stalls also get paired 2:1?