It looks like the 5th one is shown positioned as a pull-in stall. But 5 stalls? And V3? That would be a first as far as I know!
Two Tesla V3 cabinets have been delivered to the construction site. This will be a five-stall, 250 kW max Supercharger.
OK, @smartypnz. There were two V3 cabinets like those in your photo on pallets sitting in the other end of the parking lot. If you're familiar with V3 installations, you'll recognize the two smaller white enclosures by the rack in the photo I posted on Friday. For reference, here's a photo from another V3 site that shows both the smaller and larger enclosures.
Sorry, Lanny, but I was going by the only pics I saw on this thread and those look nothing like all the V3 cabinets I have seen or been to. Anyway, good luck to the soon to be opening day - sorry I won't be there.
I’ve come to the point where I trust pretty much everything Lanny says, so I wouldn’t doubt it. Also, in the site plans he posted, you can only see 2 cabinets for the 5 stalls, which would be impossible for V2
Photo I took on Saturday, October 24, 2020. Two V3 cabinets in place and five stalls standing. No power to the stalls. Unable to see if meter is installed or not. Sign said store opens in seven days.
Any word on this one yet? Just realized I will need this stop day before Thanksgiving. Sure don't want to use the old one if I don't have to.
It's been almost 2 weeks since the last update and the Royal Farms was supposed to be opened by now. Does anyone have any updates?
The store is open but the Supercharger is still not ready as of Thanksgiving day. Don't even see a meter receptacle.