Can't really tell how many. Pics show 3 cabinets with a sliver of a 4th - which relates to 16 chargers. But I think I am seeing 17 in the pix? Looks like paving isn't done in second pic, and not sure what the concrete is for in the forefront of that pic. Is that the transformer in place in pic 2?
Can't really tell how many. Pics show 3 cabinets with a sliver of a 4th - which relates to 16 chargers. But I think I am seeing 17 in the pix? Looks like paving isn't done in second pic, and not sure what the concrete is for in the forefront of that pic. Is that the transformer in place in pic 2?
When sites first get added or updated, there are often minor errors or typos and having the wrong max power is a semi-regular one. It generally gets fixed within a few weeks. Not really a problem in this instance, as the station should give better power than advertised. It's a bit more problematic when a 72 kW urban supercharger gets listed as a higher powered location.